View all projects

Water for education - education for life

Project SummaryAfrica Amini Alama promotes the education of the poorest people in northern Tanzania. Water is the basis for education, and only with a well can the Mukuru Secondary School be opened in 2026.
Donate directly

Background

The Mukuru region in northern Tanzania, not far from the large city of Arusha, is characterized by abject poverty. The Maasai community suffers from a constant shortage of water, which makes it difficult to feed their animals and fields. Worrying about their daily survival leaves no room for the education of their children.
But education is the only sure way out of poverty, leading purposefully to independence, freedom, equality and self-responsibility. Education is the key to creating sustainable change in the region.
Africa Amini Alama, which has been active as an NGO in this region for over 17 years, made the renovation and expansion of the existing Mukuru Primary School possible two years ago with the help of a sponsor.
Education is a matter close to Africa Amini Alama's heart and the project is now to be continued with the construction of a new secondary school in the immediate vicinity. The construction of this school has also already been financed by the sponsor.
However, the realization of the project is only possible if sufficient water is available. This requires the drilling of wells and the construction of a pipeline with tanks.
Read more

Idea

Water boreholes are to be drilled in the immediate vicinity of the school grounds and a pipeline built in order to provide the school with a sufficient and future-proof supply of water. Other organizations have already drilled wells in the surrounding area and it is known that water is available in this area.
A detailed cost estimate is available, which includes the drilling work as well as the construction of the pipeline and the water tanks.
Cost estimate:

  • Borehole: TZS 8 750 000 = CHF 2 750

  • Pipeline: 10 500 000 TZS = 3 300 CHF

  • Stand pipe and fittings: 1 500 000 TZS= 470 CHF

  • Pump 4HP Booster: 3 200 000 TZH= 990 CHF

  • Transportation: 2 000 000 TZS= 650 CHF

  • Labor costs: 2500 000 TZS = 780 CHF

  • Total costs: 8 940 CHF

Read more

Implementation

In order for the school to start operating for 80 pupils and teaching staff in January 2026, it is important to start drilling and constructing the water pipeline as soon as possible. Your support is crucial to make this possible. The construction of the school buildings has already begun and was financed thanks to a generous donation. So far, the required water has been delivered provisionally by tanker. However, a stable water supply is essential for long-term and sustainable operation.
Read more

Initiators

Dr.Dr. Christine Wallner, the founder of Africa Amini Alama: At 79, she is still working on the ground every day to ensure education for the poorest people in this region.

Dr. Cornelia Wallner-Frisée, CEO Africa Amini Alama

Helga Dancke: Board member of Africa Amini Alama Switzerland. I spend 3 months a year on site in Tanzania to support Christine and carry out project work at various schools.
Read more

There are no updates available
Igor Stojanov 160,00 CHF
Christina und Lisa 100,00 CHF
Marcel Gabriel 20,00 CHF
Adriana Kupper 100,00 CHF
Hans Ulrich Hardmeier 500,00 CHF
Aljoscha Bremauer 60,00 CHF
Alice Labadie 50,00 CHF
Laura Schuon 90,00 CHF
Markus Kleiner 300,00 CHF
Anonymous 100,00 CHF
Galenica AG 5'002,00 CHF
Jonas&Xinyu, Julian&Amanda 100,00 CHF
Für Jonas und Julian zum Geburtstag 100,00 CHF
Herbert Gnos 200,00 CHF
Martin Laubacher 140,00 CHF
Flavio Gnos 45,00 CHF
A. Labadie 100,00 CHF
Dalia Meier 35,00 CHF
Helga Dancke 100,00 CHF
Silvia Eggli Christen 100,00 CHF
Jonas & Julian zum 29. Geburtstag 100,00 CHF
Anonymous 400,00 CHF
Edo Meltrametti 185,00 CHF
Vermittelt durch Swisscom 170,00 CHF
Currently, there are still no project partners if you are interested, please contact us via info@there-for-you.com.

Primary Partners